Crestron CP3 — 3-Series Control Processor for Luxury Smart Home

IN STOCK OFFICIAL WARRANTY 12-24 MONTHS CRESTRON
Category: Luxury Smart Home (Crestron/Lutron) · SKU: CP3
Request a quote
Contact — depending on project scope. Reference: $4,500-6,000 for processor, total smart home for villas 200-1000m² typically $30-150K.
Crestron CP3 central controller for villas, penthouses, yachts — orchestrate AV + lighting + climate + security via single OS, luxury automation class.
  • CPU 1.5GHz quad-core — handles 500+ devices simultaneously
  • Cresnet protocol — hardwired reliability, no lag
  • Crestron Home OS — luxury UI, programmable, tailored to lifestyle
  • Integrated Sonos, Yamaha AV, Mark Levinson, JBL, KEF
  • Dual NIC redundant + UPS-aware — uptime 99.99%+
Nationwide delivery HCMC 24h · Provinces 3-5 days
24/7 technical support Hotline + Zalo + Email
100% genuine Authorized dealer
5 offices HCM · HN · ĐN · NT · CT
Request a quote Free consultation · Reply within 30 minutes

Crestron CP3 — 3-Series Control Processor is the central brain of luxury smart home automation. Unlike Aqara/Xiaomi consumer-grade (cloud-based, retail wireless), Crestron is enterprise hard-wired luxury — the Cresnet RS-485 backbone ensures zero-latency, independent of WiFi/Internet.

Used for villas 500-2000m², penthouses, yachts, private galleries. Integrates 6 subsystems into one interface: lighting (Lutron HomeWorks QSX), climate HVAC, audio multi-room (Sonos / Yamaha), video matrix (HDBaseT 4K HDR), security (intrusion + camera), shading. A Crestron certified (CTI) programmer is mandatory — no DIY.

Process design: Discovery 1-2 weeks (lifestyle interview, floor plan walk) → Pre-construction wiring 4-6 weeks (rack room design, Cresnet trace) → Programming 3-6 weeks (custom scene per room, multi-user profile) → Commissioning 1-2 weeks (training family + housekeeper).

An Ninh Số is a Crestron Authorized Dealer in VN with 3 CTI certified programmers. Has commissioned for villas in Thảo Điền, Đảo Kim Cương, Phú Mỹ Hưng.

Processor ARM Cortex-A 1.5GHz quad-core
RAM 1GB DDR3
Storage 4GB internal + microSD up to 128GB
Network Dual Gigabit Ethernet (failover)
Cresnet ports Cresnet bus (RS-485) cho 252+ device
Serial 8× COM RS-232/422/485
IR/Sensor 8× IR-IT + 8× sensor input
Relay 8× isolated relay (low voltage)
Power 100-240V AC, 30W typical
Mounting Rack 1U + standalone desktop
  • Villa 500-2000m² — orchestrate 200-500 devices via scene per moment
  • Penthouse luxury — multi-room AV + shading + climate single UI
  • Yacht private — battery-aware load shedding + bridge integration
  • Private gallery / showroom — controlled lighting for artwork preservation
  • Hotel boutique presidential suite — guest-aware automation
FAQ

Câu hỏi thường gặp

How is the Crestron CP3 different from the Aqara Hub M3?

Different class: Crestron CP3 is enterprise hard-wired (RS-485 Cresnet), reliability 99.99%, certified programmer required, $30-150K for one villa. Aqara M3 is consumer wireless (Zigbee/Thread/WiFi), reliability 95%+, DIY-friendly, $2-15K for the same area. Suitable for different audiences: Crestron for HNW requiring zero-compromise, Aqara for mid-tier upper class.

Do I need to reprogram when changing the sofa / moving the TV?

If only changing furniture → no need to re-program. If changing cabling (adding rooms, changing wall structure) → need a Crestron certified programmer to update logic. An Ninh Số has an annual SLA service for ongoing change requests.

Does Crestron support Vietnamese?

UI Crestron Home OS has a multilingual interface — An Ninh Số custom Vietnamese UI for households. However, technical documentation and programmer training remain in English. There are still few Crestron certified programmers in Vietnam (~10 people), and An Ninh Số has 3 CTI.

Lead time for Crestron deployment for a newly built villa?

Depends on the stage: if before completion (wiring) — 4-8 months for a 500m² villa. If after completion (retrofit) — more complex, +2-3 months and additional wall demolition. Recommended to get involved from the electrical rough-in stage.