The AI camera people counting system for subways is a solution that integrates computer vision into metro station infrastructure, automatically measuring occupancy on platforms and train cars in real time. On one Asian metro line, this technology helped reduce peak-hour overcrowding incidents by 30% and increased passenger satisfaction by 15% after just 6 months of operation.

Customer: City X Metro Operating Company (Southeast Asia)
Industry: Public Transportation / Passenger Transport
Scale: 12 stations, 15 km of railway, 200,000-250,000 passengers/day
Location: Coastal city, population 3-4 million
Solution: 3D stereo vision people counting camera system + Real-time occupancy management dashboard

Customer Challenges

Customer Challenges
  • Uncontrolled peak-hour overcrowding: Platforms frequently exceeded 120-150% of design capacity during 7-9 AM and 5-7 PM slots, causing severe congestion.
  • 15-20 incidents/month related to overcrowding: Including train delays due to doors not closing, passengers fainting from crowding, and arguments among commuters.
  • No real-time occupancy data: Station staff relied solely on manual observation and personal experience to decide on blocking entrances or requesting additional trains, leading to 5-10 minute delayed responses.
  • 12% increase in operational costs due to overtime: Security and dispatch teams had to work continuous overtime to handle overcrowding incidents, inflating the payroll budget.

Solution Deployed by Việt Đức Trí Group

Solution Deployed by Việt Đức Trí Group

Việt Đức Trí Group proposed a 3D stereo vision people counting camera system installed at 12 stations, combined with a real-time occupancy management dashboard and automatic alerts. The deployment process consisted of 5 main steps over 8 weeks.

  1. Survey of current conditions at 12 stations: Measured actual traffic flow, identified 24 strategic camera installation points (2 cameras/station) in platform and fare gate areas.
  2. Installation of 3D stereo vision cameras: Used Xovis PC3 cameras with 99% accuracy under metro station lighting conditions, resistant to vibration and interference from trains.
  3. Integration with existing SCADA system: Connected real-time occupancy data to the Operations Control Center (OCC) via API protocol, enabling display on large screens.
  4. Development of a 3-level alert dashboard: Alerts triggered when occupancy reached 70% (yellow alert), 85% (orange alert), and 95% (red alert - requiring immediate intervention).
  5. Operations and maintenance training: 3 days of training for 30 dispatch and technical staff, including emergency response procedure manuals.

Achieved Results

Achieved Results
  • 30% reduction in overcrowding incidents: From 18 incidents/month down to 12-13 incidents/month after 6 months of operation.
  • 15% increase in passenger satisfaction: Periodic surveys showed satisfaction scores for crowding levels rose from 3.2/5 to 3.7/5.
  • 25% reduction in response time: From 5-8 minutes down to 1-2 minutes when an overcrowding alert was triggered, thanks to real-time data.
  • ROI under 18 months: Savings of 240 million VND/month from reduced overtime and incident handling costs, against a total investment of 3.8 billion VND.

"Before, every Monday morning was a nightmare for the dispatch team because we didn't know which station was overcrowded. Now, the dashboard displays real-time occupancy, and we can dispatch additional trains in just 2 minutes. The system has changed how we operate the metro."

— Mr. Trần Văn Minh, Operations Director, City X Metro

Lessons for Vietnamese Metro Lines

Lessons for Vietnamese Metro Lines

From this case study, operating and upcoming metro lines in Vietnam, such as the Bến Thành - Suối Tiên Metro (HCMC) or the Nhổn - Hanoi Station Metro, can draw 4 important lessons to optimize operations from the start.

  1. Integrate people counting systems from the station design phase: Installation costs will be 30-40% lower compared to retrofitting after the station is operational. Camera locations and network infrastructure should be pre-planned.
  2. Combine multiple data sources for higher accuracy: 3D stereo vision cameras should be supplemented with data from turnstiles and train weight sensors for a comprehensive occupancy picture.
  3. Build flexible operational scenarios based on data: Instead of running fixed schedules, metros can adjust train frequency based on real-time occupancy, especially during holidays or special events.
  4. Invest in operational training and a data-driven culture: Technology is only effective when the operations team trusts and uses data for decision-making. It takes 3-6 months to transition from experience-based to data-driven operations.

Comparison: AI People Counting Camera vs. Infrared Sensors for Metro

Comparison: AI People Counting Camera vs. Infrared Sensors for Metro

During the solution survey, the technical team evaluated two main technologies: AI people counting cameras and infrared sensors. The comparison table below explains the reason for choosing AI cameras.

Criteria AI 3D Stereo Vision Camera Infrared Sensor
People counting accuracy 95-99% 70-85% (prone to interference in crowds)
Distinguishes adults/children/luggage Yes (3D shape analysis) No (counts thermal signals only)
Operation in vibrating environments Good (anti-vibration mode) Average (prone to errors with vibration)
Initial investment cost 40-60% higher Lower
Dashboard integration capability Built-in open API Requires intermediate gateway

Frequently Asked Questions

Does the subway people counting system work accurately during crowded peak hours?

Yes. The 3D stereo vision camera uses two lenses to create a depth map, allowing it to distinguish individuals even when they are standing close together. In this case study, accuracy remained at 95-97% even when density reached 4-5 people/m² on the platform. The system can also filter out interference from luggage, strollers, and non-human objects.

What is the cost of deploying a people counting system for a 10-station metro line?

The total investment cost for a people counting system at 10 stations (20 cameras + dashboard + SCADA integration) ranges from 3-5 billion VND, depending on the existing network infrastructure and integration requirements. Annual maintenance costs are approximately 8-12% of the initial investment.